Altius Breakbulk transport from China and Taiwan to Peru.
Altius successfully completes Breakbulk transportation from China and Taiwan to Peru for PMRT Project (Talara).
Sea-transport was carried out aboard the Heavy-Lift vessel M/N Clipper Newark. Main cargo pieces were discharged onto SPMT's (24 single lines) and placed on stools at laydown area.
The entire breakbulk cargo will be transported by road to the Talara refinery (Peru) for this PMRT project.
This shipment's main piece was a 36 m long stripper column weighing 102 tons.