Altius shipment from Gijon (Spain) to Novorossiysk (Russia)

Shipment carried out by Altius Bilbao projects, from Gijón to Novorossiysk. It was loaded on 2 September in Gijón and unloaded on 16-17 September in Novorossiysk.

The cargo consisted of two pieces (a 201-ton Product Stripper and a 492-ton Fractionator), both of which traveled on deck, properly and securely stowed.

IMG_4303 9 5 1