Unloading of Sun Master Vessel Carrying Cargo for Potosi's Cement Plant

yellow crane 3

Potosi's Cement Plant works continue. Unloading of the third breakbulk shipment was recently carried out at Arica Port in Chile. An ALTIUS engineer was present to oversee operations, to guarantee they were carried out properly, and to be able to inform client in full.

Cargo was labeled according to the project's code and stowed at the port in order to estimate a proper delivery schedule to the Cement Plant. Land transportation from Arica to Potosi (Bolivia) is set to begin the following week, the number of trucks involved being stipulated by the client (according to work site limitations).

 

yellow crane TPAyellow crane boatyellow crane truck-2

Unloading of Sun Master ship with cargo for the Potosi Cement Plant

yellow crane 3Work continues on the Potosí Cement Plant. Recently the unloading of the third shipment with breakbulk cargo was carried out in the port of Arica (Chile). An ALTIUS engineer was present during the unloading to guarantee a correct operation and to be able to inform the customer properly.

All the cargo was labelled according to the project code and stowed at the port in order to estimate a delivery sequence to the plant. The land transport from Arica to Potosi (Bolivia) will start the following week, according to the number of trucks stipulated by the client (depending on site constraints).

yellow crane TPA

yellow crane boat

yellow crane truck-2