potosi 2

Potosi Cement Plant Project

Altius forges ahead with Potosi Cement Plant Project logistics in Bolivia, for which they have been hired by Sacyr Industrial. The project began in January 2018, with the first shipment of containers.

WhatsApp Image 2018-04-05 at 15.00.39 002

Besides container cargo, the onshore project cargo (8 shipments unloaded and delivered, and one shipment by sea in transit), which included assistance during unloading in Arica (Chile) and transportation to work site (where a person was sent expressly to handle receipt of documents and management of drivers for successful unloading operations), was also coordinated by Altius.

Up to now project progress can be summarized as follows:

  • Breakbulk cargo: 9 shipments/360 loads/3,650 tons/19,000 CBM
  • FCL cargo: 322 containers (619 TEUs)