Transport from Rijeka port to Jebel Ali

Altius successfully carried out the transport of two 230 ton Transformers from Croatia to Jebel Ali. Altius handled all logistics operations from the moment the

Altius transports column cell

Altius carried out successfully and smoothly, transportation of a column cell weighing 10,900 kg from FOB Santos to job site in Mantos Blancos for the

Land transport from Madrid to Herford

On May 18th, Altius transported three tanks from Madrid (Spain) to Herford (Germany). Said over-dimensioned tanks measured 12.05×4.83×3.84 meters and each weighed 18 tons. Everyone

Transport from CFA Izmir-Aliaga to CFR Tema

Altius carried out transportation of four transformers plus accessories from CFA Izmir-Aliaga (Turkey) to Tema (Ghana) intended for a substation project at Pokuase. Total dimensions

Troncontin and Progreso Projects in Honduras

Altius recently carried out the transport of two, 90 ton each, transformers for the Troncontin and Progreso projects in Honduras. Altius was responsible for the

Transport from FCA Marina di Carrara to CFR Damman

Altius carried out the transport of a 103 ton centrifugal compressor, with dimensions 14.5 x 5.05 x 3.85 meters, from Italy (FCA Marina di Carrara)

Altius Attends the SICAB Fair in Seville as Exhibitor for the First Time

Marta Esteban and Pablo Roa   Altius attended for the first time one of the most significant events renowned in the equine world, namely the

Meet our Colleagues from Altius Miami

  Click on the link to meet our colleagues from Altius Miami and to check out our facilities.   https://vimeo.com/368725504  

Conxemar 2019

Once again we will be present at Conxemar as exhibitors this year. We would love you to come and visit our stand B3

Altius Coordinates Maritime Transport of 195 ton Reactor

  A 195 ton reactor measuring 28 x 5 x 4 meters, was unloaded at the port of Houston last September 14th. The reactor had

First Air Shipment of Horses from Zaragoza to Mexico

On Wednesday, July 24th, our first air shipment of horses from Zaragoza to Mexico was successfully carried out. The horses were taken by horse trailer

New Shipment for Ras-Tanura Project

ALTIUS Madrid carried out a new shipment for Ras-Tanura project (KSA) from The Netherlands. Due to their dimensions (up to 28.5 m of length and

Altius Offers New Regular Groupage Services to Argentina

  Altius offers new and exclusive regular groupage services from Vigo to Puerto Madryn and to Puerto Deseado in Patagonia (Argentina).   Whereas up to

Consolidating Altius RORO Department

  The RORO department at Altius continues to grow thanks to our clients’ trust and to the quality services rendered. As a matter of fact,

OEA Re-evaluation

With the implementation of the new Union Customs Code (CAU) of May 1st 2016, a re-evaluation of all existing Authorizations and Certificates became necessary. Among

Altius Shipment from Tarragona to Saudi Arabia

  ALTIUS coordinated loading operations of an effluent exchanger (L x W x H: 20.28 x 5.51 x 5.46 m // 232 T) and remaining

Altius Handles Construction and Loading of a Port Crane in Bilbao Port

Our Bilbao team has been handling a high complexity project since 2016. The docks at the port of Bilbao have witnessed, for the past 16

Potosi Cement Plant Project

Altius forges ahead with Potosi Cement Plant Project logistics in Bolivia, for which they have been hired by Sacyr Industrial. The project began in January

Altius gets involved in a pro bono Project at “la Casa de los Maestros”

  Altius lent a hand in carrying out a beautiful project called “la Casa de los Maestros” (the Teachers´ House), a house in  Las Hurdes

Altius at the Fruit Attraction Fair 2018

As every year, we were present at the Fruit Attraction Fair in IFEMA, Madrid, with our Altius stand. During the three-day Fair, which lasted from