Item Details

 

Last week (mid-September), ALTIUS successfully completed sea transportation and discharge operations of heavy-lift units and conventional break-bulk cargo for the Talara Project in Peru.  All cargo was shipped from Masan (Korea) to Paita (Peru) on board the heavy-lift vessel M/V BBC Amber.  A Crude Distiller (62,0×8,3×9,0 m and 447 tons) and a Fractionator Column (46,6×6,6×6,9 m and 214 tons) were the shipment´s heaviest units.

 


  • Client:
  • Author Name: Derek Andorson
  • Author URI: http://example.com
  • Release Date: 18 October, 2016